Mobile concrete batching plant,Mixing Plants Benninghoven ECO 3000

Concrete batching plants Benninghoven
 
Benninghoven ECO 3000
 
 

Adverts

1000 USD
Used Rapidly erected plant Benninghoven ECO 3000 - 240 t / h, 2011 Operating time 513,000 tons. The main difference between ECO asphalt batching plants is the design of their main components, which corresponds to the dimensions of a standard (20- or 40-foot) shipping container, which makes them easy to transport by truck, sea or rail. Manufacturing parameters: АБЗ ECO 3000 model Mixing capacity (t / h) 240 Installation methods Stationary = solid concrete foundation; movable - movable steel bases Pre-dosing system Number of dispensers 5-tier pre-dispensing module Capacity (m3) 12 Loading ramp Provided by the operator Loading width (mm) 3500 Dryer drum Type TT 11.26 Drum drive power (kW) 4 x 22 Burner Type EVO JET 4 FU liquid fuel Burner power (MW) 24 Dust extraction system Productivity (Nm3 / h) 78,000 Hot mineral screen / hopper Screening capacity (0-2 mm, t / h) 270 5-deck screening Hot mineral bunker 17 t / 5 chambers (including sand + bypass) Mixing and weighing section Mixer (kg) 3000 Scales for mineral rocks (capacity, kg) 3000 Scales for aggregates (capacity, kg) 400 Scales for bitumen (capacity, kg) 350 Mixture storage hopper / aggregate silos The total capacity of the storage hopper for ready-mix MGVS 60 t (2 cameras + direct download sector) Aggregate silos 60 m³ silo for own aggregate, 60 m³ silo for imported aggregate. Bituminous system Execution horizontal, electrically heated and insulated 200 mm Capacity (m3) 3 x 60 Benninghoven BLS 4000 computer control system: switching and power parts, air conditioner and main low-voltage switchboard Asphalt Granulate Supply Systems Through the middle ring of the dryer - Loading 25% RAP The plant is in excellent working order.
c-equipment.com.ua
2011 yr (used)
Scandinavian & UK Machines
Russia
+38 050 738 33 48
1000 USD
Used Rapidly erected plant Benninghoven ECO 3000 - 240 t / h, 2012 Production of 1 476 thousand tons. The main difference between ECO asphalt batching plants is the design of their main components, which corresponds to the dimensions of a standard (20- or 40-foot) shipping container, which makes them easy to transport by truck, sea or rail. Manufacturing parameters: АБЗ ECO 3000 model Mixing capacity (t / h) 240 Installation methods Stationary = solid concrete foundation; movable - movable steel bases Pre-dosing system Number of dispensers 5-tier pre-dispensing module Capacity (m3) 12 Loading ramp Provided by the operator Loading width (mm) 3500 Dryer drum Type TT 11.26 Drum drive power (kW) 4 x 22 Burner Type EVO JET 4 FU liquid fuel Burner power (MW) 24 Dust extraction system Productivity (Nm3 / h) 78,000 Hot mineral screen / hopper Screening capacity (0-2 mm, t / h) 270 5-deck screening Hot mineral bunker 17 t / 5 chambers (including sand + bypass) Mixing and weighing section Mixer (kg) 3000 Scales for mineral rocks (capacity, kg) 3000 Scales for aggregates (capacity, kg) 400 Scales for bitumen (capacity, kg) 350 Mixture storage hopper / aggregate silos The total capacity of the storage hopper for ready-mix MGVS 60 t (2 cameras + direct download sector) Aggregate silos 60 m³ silo for own aggregate, 60 m³ silo for imported aggregate. Bituminous system Execution horizontal, electrically heated and insulated 200 mm Capacity (m3) 3 x 60 Benninghoven BLS 4000 computer control system: switching and power parts, air conditioner and main low-voltage switchboard Asphalt Granulate Supply Systems Through the middle ring of the dryer - Loading 25% RAP 1 unit cold asphalt recycling systems 1 unit bitumen modification plant - 12 t / h - Tecno Mill The plant is in excellent working order.
c-equipment.com.ua
2012 yr (used)
Scandinavian & UK Machines
Russia
+38 050 738 33 48
1000 USD
Used Rapidly erected plant Benninghoven ECO 3000 - 240 t / h, 2015 Production of 258 thousand tons. The main difference between ECO asphalt batching plants is the design of their main components, which corresponds to the dimensions of a standard (20- or 40-foot) shipping container, which makes them easy to transport by truck, sea or rail. Manufacturing parameters: АБЗ ECO 3000 model Mixing capacity (t / h) 240 Installation methods Stationary = solid concrete foundation; movable - movable steel bases Pre-dosing system Number of dispensers 5-tier pre-dispensing module Capacity (m3) 12 Loading ramp Provided by the operator Loading width (mm) 3500 Dryer drum Type TT 11.26 Drum drive power (kW) 4 x 22 Burner Type EVO JET 4 FU liquid fuel Burner power (MW) 24 Dust extraction system Productivity (Nm3 / h) 78,000 Hot mineral screen / hopper Screening capacity (0-2 mm, t / h) 270 5-deck screening Hot mineral bunker 17 t / 5 chambers (including sand + bypass) Mixing and weighing section Mixer (kg) 3000 Scales for mineral rocks (capacity, kg) 3000 Scales for aggregates (capacity, kg) 400 Scales for bitumen (capacity, kg) 350 Mixture storage hopper / aggregate silos The total capacity of the storage hopper for ready-mix MGVS 60 t (2 cameras + direct download sector) Aggregate silos 60 m³ silo for own aggregate, 60 m³ silo for imported aggregate. Bituminous system Execution horizontal, electrically heated and insulated 200 mm Capacity (m3) 3 x 60 Benninghoven BLS 4000 computer control system: switching and power parts, air conditioner and main low-voltage switchboard Asphalt Granulate Supply Systems Through the middle ring of the dryer - Loading 25% RAP 1 unit cold asphalt recycling systems 1 unit bitumen modification plant - 12 t / h - Tecno Mill The plant is in excellent working order.
c-equipment.com.ua
2015 yr (used)
Scandinavian & UK Machines
Russia
+38 050 738 33 48
  Add advert